Project Update: Project Update: Production Updates! - 07/21/2023
Hello everyone! It's been awhile, so here's a production update. As you can see, the stickers have arrived! They look just as I'd hoped, so I'm very excited.
Plushes are almost ready to ship to me as well. All of the designs except the Zebra Finch Griffinch are complete. Look at these big, fluffy piles!
The manufacturer accidentally used a previous sample as the template for the Zebra Finch Griffinches, so the plushes were made with a minor inaccuracy. The corrected plushes will be completed within a week or two, and then everything will ship to me. Thankfully, it's still within the predicted timeframe so it shouldn't cause any major delays.
For transparency: the incorrect plushes are being disassembled and their materials will be used again to prevent waste.
That's all for now--thank you for your support!
For transparency: the incorrect plushes are being disassembled and their materials will be used again to prevent waste.
That's all for now--thank you for your support!
Comments
3